C a n a d a

HÔPITAL JIM PATTINSON

Tous les projets
Livraison
Mars 2011
Durée des travaux
31 mois
Entreprise
BOUYGUES BATIMENT INTERNATIONAL
Maître d'ouvrage
FRASER HEALTH AUTHORITY
Architectes
KASIAN ARCHITECTURE
Pays
Canada

When nature and technology meet

Located in the vibrant and dynamic City of Surrey this hospital for outpatient consultations and ambulatory care nestles in a huge national park.

While Surrey is the fastest growing city in Canada and has numerous buildings more than 100 m high, the local ethos is very much centred on the love of the great outdoors and natural conservation. Therefore, while the hospital has four floors of clinical premises and operating theatres, ultra-modern modular spaces and leading-edge equipment, it is at the same time designed to be pro-actively ecological and also meets the most demanding environmental standards: trees pruned outside the nesting season, maples and green spaces preserved on the site… Its design was also developed in parallel with construction, enabling the entire finishing phase to be conducted in consultation with its future users.

The project can thus expect to be LEED Gold Certified (Leadership in Energy and Environmental Design).

4 étages
34 000 m2
400 places de parking
01

Gestion des installations

1er PPP canadien, ETDE FM Canada, également filiale de Bouygues Construction, a remporté le contrat de maintenance du bâtiment pour les 30 prochaines années. Parmi les objectifs fixés: maintenir la politique verte établie en utilisant des produits écologiques et obtenir la certification d’entrepreneur canadien en durabilité verte. Le projet a été conçu conformément au programme américain de développement durable LEED Gold (Leadership in Energy and Environmental Design). Économie par rapport à la conformité au code: 38%.

rotate

Veuillez faire pivoter votre appareil en mode paysage pour une meilleure expérience.